Have some underfloor heating to install-one end is black with an earth screen and the other end is blue with an earth screen-I take it I connect live to the black and neutral to the blue and earth it at both ends?
I have joined 3x2.5mm cables on a ring main by soldering and heatshrink/tape behind plasterboard-is this ok or do I need to use a junction box? have used a 200W soldering iron so they are good solid joints
Some of the things are hard to notice-sliced grommet could be difficult to pick up-on the last test they had 1.5mm wire feeding 2.5mm wire but that wasn't a fault?
anyone got any pictures of fault board scenarios? got 2391 practical on monday and its just the fault board I need to do, passed the other 3 but not being an electrician am struggling to see all the faults on the fault board
just failed practical on two out of four assessments-only spotted 11/12 faults on the board and left key in main switch padlock when doing motor starter circuit! gutted because was going ok, got Ze and PFC right for 3 phase system and passed the other two assessments (insulation resistance and...
thanks for that, so double the highest PSSC will be the answer-remember lecturer saying u don't have to bother with PEFC as PSSC will be higher, cheers
Yeah got GN3 but didn't explain the three phase situation all that clearly,so whatever reading I get for PEFC I just double the highest one and put that in the Ka box? cheers