hi folks bit of a strange one for you
I have a friend who is running a small caravan boiler to heat water for a window cleaning system.
The problem he has when he turns off the pull at the end of the pipe the pump has a sight over run that can on occasions cause the boiler to get over...
hi folks I have been asked to put in an additional spur for a socket at a friends house.
The only problem is there are not sockets near by to pull e spur off the ring and there are no free mcb' s to pull a new dedicated radial circuit off the consumer unit.
The only option I have would be to...
hi I have a work shop that is built out of concrete blocks with insulation in the cavity and a flat roof the roof void has been filled with insulation.
The whole workshop has been lined with 9mm laminated melimine boards.
However I have started to suffer a problem with condensation on the...
hi folks bit of a strange question for you . I have a shower tray which I am going to fit it only has a 50mm waste v 90mm I have on other shower trays I have fitted.
I know that the flow rate will be limited by the pipe work which I this case drops down to 40m. Then a 32 mm boss.
My question...
I folks after a little advice.
I have a grohe mono basin mixer tap. It currently has 2 10 mm chrome feed pipe coming out of the bottom of it.
However I want to replace these with speed fit flexible pipe.
I have tried unscrewing them and whilst they will turn they will not unscrew...
Great idea but not quite that easy.
Ok the boss has to sit on the floor to give me the drop from the shower.
The pipe throughout the floor is a complete 110mm run so to fit a tee I would have to put in a slip connector which would mean having to chip out the floor and cut the pipe below...
Hi thanks for the reply's folks
i have to have the boss on the floor or as close to it as i can get it as it need to take the feed from the shower which which will brake through the wall at 50mm high and connect into the boss.
I would prefer to not have to hack out the floor if at all...
Hi folks back for some more advice please as i am a little stuck with this one.
First i have the main stack that i have to break in to to fit the toilet with some sort of tee connector as the toilet is off set from the stack about 300mm
i also need to have a boss tee as close to the as...