My plan is to move a toilet. It will be in a small space, closet WC. Once moved the waste pipe horizontal pattern will be pan spigot to 200mm straight, then a 90 deg angle to ~250mm straight, then another 90 deg angle to 1000mm straight to soil stack. Ground floor, concrete.
Is this an...