I usually try and run the waste under the plyth. If this isn't possible is it ok to run higher up behind the unit. I think there is usually a 75mm void? Would then require the joiner to knotch the back of the units.
What is the unit called that the ground source heating pipes go to to transfer the heat from the refrigerant to the heating pipes to go around the system? Thanks