    Pebledash advice

    Hi I am about to start pebble dashing or at least the scratch coat to the annexe I have converted. I understand the scratch coat should be a 4:1 mix Question 1 is builders sand ok or do I need something else. Question 2 part of the building is new block work some is brick and some old render...
  2. C

    cooker install

    oh I spotted this on the site under tech spec for that cooker. but you are right 30a is fine
  3. C

    cooker install

    perfect thank you
  4. C

    cooker install

    Hi I have just seen or the wife has this cooker : http://www.appliancesdirect.co.uk/p/hae60ks/hotpoint-hae60ks-60cm-electric-cooker?refsource=apadwords&gclid=CKumk_DB08YCFUPLtAodOj4PSQ it's on a site called appliances direct and this states fuse rating of 44.60 how does that work then if I go...
  5. C

    cooker install

    oh thanks that's easy then just have to find a cooker now.
  6. C

    cooker install

    we currently have a hob on a 30amp circuit and a double oven the other side of the kitchen on a different 30amp circuit. I recently got a freestanding cooker that is blowing the fuse but only when the grill is turned on. We have decided to get a new cooker but on going to currys today I saw a...
  7. C

    cooker placement near windows question

    Hi I am in the process of converting a building into an annexe but now have so many windows in the kitchen ( all approved by BC ) I don't know if I will have issues placing the cooker. Are their rules around how close a cooker can be to open windows ? I also have a roof window in the kitchen...
  8. C

    wiring an annex from main house ???

    Storage heaters X 2 as no mains gas. Ok thanks for all the replies I will speak to the electrician coming around in the next week or so and then apply to get another supply fitted. Thanks for all the advice. a new supply it is then. Cliff
  9. C

    wiring an annex from main house ???

    This will be a separate 1 bed annexe, no washing m/c or dryer it's for a disabled relative. If I have a separate install is the work done first then the main electrics laid on and installed or would I need to get the power laid on prior to work. Cliff
  10. C

    wiring an annex from main house ???

    Oh I knew someone would ask, I only thought to post a topic when art work so don't know the separate rating of the outbuildings. we are having 5 lights ( including one in shower room) approx. 12 sockets ( doubles) electric shower Electric cooker point extractor in kitchen and...
  11. C

    wiring an annex from main house ???

    I am almost ready to get the electricians in and wanted to pick your brains first : we currently have the annexe ( was a stable, now being copnverted ) supplied with electrics from the house. When I get this re wired can I keep this configuration, Main house consumer unit has a separate...
  12. C

    fall for a 1:60 rainwater soakaway

    Really helpful thanks that answers my questions. Cliff
  13. C

    fall for a 1:60 rainwater soakaway

    I have printed out the document and will read through it, but one question you may know. does it stipulate how deep I need to go for the trench? Thanks Cliff
  14. C

    fall for a 1:60 rainwater soakaway

    That's really helpful thanks very much Cliff
  15. C

    fall for a 1:60 rainwater soakaway

    Hi can someone help, I need to know how to work out the fall, I am putting in a rainwater soak away 5m from the annexe. What would the fall be, I have looked on various web sites and worked it out to be around 100mm is that right and if so how do I work this out. I also need to work out foul...
  16. C

    insulation board fixing

    Yes thought of that and the bathroom fixing sink etc Thanks for the help. Cliff
  17. C

    insulation board fixing

    Thanks for the quick reply, so if I don't fix the celotex and just hold with the battens ( snugly ) will that be ok when the plasterboard is fitted ? Cliff
  18. C

    insulation board fixing

    I thought that to start with but as I had never done this before I had the architect draw up a schedule of works, This was submitted to building control and everything signed off as ok and correct. It states : PIR Insulation GA4000 50mm direct onto block work then 25mm battens and...
  19. C

    arched lintel

    Hi just to finish this topic off, I got in touch with building control and they tell me it needs a lintel designed. I asked a few builders merchants in my area and was given prices but no drawings, going to someone else he looked at it and has now been great getting in touch with building...