Search results

  1. T

    Countersink chipboard?.

    Thanks for that. :)
  2. T

    Countersink chipboard?.

    Hello again, I'm putting down 22mm chipboard flooring, do I need to drill pilot holes and countersink ?. I have a fairly good 15.6v Panasonic cordless driver. Also should I Cuprinol the joists and underside of chipboard?.
  3. T

    Multifuel stove for central heating.

    Hi, I'm looking at putting in a multifuel stove for central heating. The model most suitable for DHW and radiators puts out 3.7kw to the room. The room it will be in is approx. 70m³, so the output is probably on the high side but is it far too much?.
  4. T

    Locations of sockets.

    Hi, I found a website showing the required locations for sockets for new regulations, regarding disabled use I think?. I've lost the site, can anyone help with the address please?. I'm in Scotland, if it makes any difference!.
  5. T

    Lintel/door frame fixing.

    Many thanks again.
  6. T

    Lintel/door frame fixing.

    I'm knocking an opening for a door in a single brick wall. Existing door frames in the house have the top part built into the wall about 6" either side under the lintel. Do I have to make the frame first then build it in like this or do I just bang it up after with hammerfixes ?.
  7. T

    Fitting a UB.

    Thanks all.
  8. T

    Fitting a UB.

    Just done a search and found most of the info. My SE makes no mention of padstones just a 300mm bearing at each end. It's a 4m beam, 203x102, is there a standard padstone size for this?.
  9. T

    Fitting a UB.

    HI, I'm taking down an internal brick wall and replacing with a UB. All permissions and calculations in place. What's the method of packing under the ends to level the beam off at the right height?. I'm thinking of holding it up against the joists with a couple of acrows and building up under...
  10. T

    First/second fix.

    Many thanks for the replies, much appreciated.
  11. T

    First/second fix.

    Hi, I've done a lot of remedial work on a 1920s brick built end terrace and am now looking at a 4m extension on the 1½ storey end. I intend to do the great majority of internal finishing work myself, can anyone give me some sort of definition of the terms first fix and second fix, as they...
Back
Top