  1. R

    70mm stud

    Im going to be carry out the work myself and based on 17th edition and the recommendations here (thank you for), Im going to run SWA through grommeted holes in the metal studs.
  2. R

    70mm stud

    perfect, thank you I should have mentioned, does this still apply in commerical? Its just a reception partition wall. On other thing as well, will vertical run from top of stud wall down to socket level still be within safe zones??
  3. R

    70mm stud

    I assume I can run standard T&E up to where it enters the stud wall, then us a 17th edition junction box to connect to the armoured cable that will run through the wall?? There is a suspended ceiling so I plan to run the cables from the CU on cable trays to above the wall, then drop down in...
  4. R

    70mm stud

    Right, so the condit would be more for the safety of making the wall "Live" if wiring became damaged and touched the construction material (which in this case is metal). Make sense. Any holes through the studs will be grommeted to prevent slicing of the cable, Or I could just come vertically...
  5. R

    70mm stud

    The studs are Metal C Stud, 70mm depth, with 12.5mm plasterboard either side
  6. R

    70mm stud

    Is it a requirement that wiring is to be in steel conduit in a 70mm stud wall. The wiring will be protected by an MCB and Main RCCB
  7. R

    To Laser or not

    Im Just looking at 2 now, the Bosch PLL 360 and the Stanley STHT1-77137 Any one used one of these?
  8. R

    To Laser or not

    Thanks for the comments, looks like I will be getting a Laser Level then!! Is it a must have for a 3 line laser? Or would a 2 line with horizontal 360 do the job (like the Bosch PLL 360) Thanks Old-Robin, Im probably going to get a self leveling jobbie though, sorry
  9. R

    To Laser or not

    I need to buy me a few new levels and set squares to erect some external and internal metal stud walls. I was wondering if it would be better to invest in a laser level, or can you simply not do away with the traditional bubble levels and set squares??
  10. R

    Door Frame

    just a quick question, why on a door frame size does it give the depth as 115mm but then state the finished depth is 106mm?
  11. R

    Insulation Board

    Hi, I could strap the insulation board in place inbetween the C section studs if that would work. The only other way I can think of putting a backing plasterboard on to hold the insulation in place would be to attached the backing plasterboard to the C section up rights first, then lift it...
  12. R

    Insulation Board

    Normally insulation board fits in the cavity between two wall surfaces. But is it ok if the wall didnt have a back on it (internal wall) So say on a commercial unit, Im putting a metal stud wall close to the external wall of the building. But I cant get right next to the external building...
  13. R

    Open Back Dry Wall Insulation

    Got
  14. R

    Stud Walling

    Morning All, I'm building a number of stud walls on top of a mezzanine floor at a unit I have, in order to provide an enclose office space. 3 of the walls run close to the main steel structure of the unit, so i can brace on to that to add some regidity to the walls. Then there is a 12m run of...
  15. R

    Main Cable in Industrial Unit

    Morning All, Thought I would finish this thread off and tell you Im still alive!! I decided to very slowly and carefully drill the holes, checking that is was still concrete at the bottom of the hole every few mm. Took a little while but glad to say all went well and didnt hit anything...
  16. R

    Main Cable in Industrial Unit

    Thanks for all the advice guys, going to take a look at it this weekend In terms of access to electrical equipment, are there rules to how much room there needs to be.
  17. R

    Main Cable in Industrial Unit

    Tell a lie, I have one I took a little while ago
  18. Untitled

    Untitled

  19. R

    Main Cable in Industrial Unit

    Thanks guys, Yes, I can see the end of the bend as it pops out, so can see the direction (right toward the mezzanine post!! :shock: ) Im not at the unit for a few hours so will get a pic up then, and measure the wire diameter
  20. R

    Main Cable in Industrial Unit

    The post is about 10cm from the wall, and I am using 150mm anchor blots (although the anchor part is alot less so only need to drill about 50mm) If its too risky, I could probably weld up from kind of strut to the wall. I guess a 3 phase supply aint something you want to risk messing with if...