When undertaking a rewire for say a house, is it usual practice to replace all the cables? Is there a case for retaining any cabling? Does a rewire include adding and/or moving existing sockets/switches.
Sorry what I meant was where do you measure Zdb. Ze is measured between the supplied earth with main equipotential bonding disconnected and the incoming phase. Zdb between....
Just read a PIR and it states that there is no means of earthing (TT supply with no earth rod). But it also says that the External Loop Impedance is measured at 648ohms. How did they measure that with no supplied earth?
I checked on the working( short) cable and all the colours on one RJ45 go to the same terminal on the other one. What I have are two identical cables, one 1m long and the other 25m long but the long one does not work. Help
I hope this is the correct forum for this problem. I have a wireless router that I want to use via the ethernet connection. When I connect the PC with the supplied short ethernet cable to the router it works fine. I laid a 20m CAT5e cable about 20m long and connected the RJ45 connectors either...
The hob is presently connected via an unfused spur from the ring(not good). I will be rewiring it so that it is connected to the allready connected cooker radial (6mm2 T&E with CCU) supplying the oven.
Thanks for the replies.
I really don't want to have to insulate the rafters as this will lower the sloping elements and reduce the usable living space. So I spoke to celotex and they said that if I doubled up the layers of celotex ie 2*90mm=180mm between the rafters (I was supplied a huge...
I am building a timberframe chalet style bungalow. I want to do the insulating and tacking in the bedrooms in the roof void myself. I have been supplied all the insulating materials and was told to use the 90mm celotex sheets and 80mm glasswool insulation rolls together in the sloping ceiling. I...
Mike did NAPIT not suggest you first do the trade test at thier headquaters in Mansfield? If you do the 2 day test you will soon find out if you are ready for your on site assesment.