hi @Milleniumaire, at the end, the UFH manifold was installed on the ground floor next to the orangery that got built. The pipework from the manifold runs up along a wall in a room on the groundfloor (pipes are boxed in so looks fine), under the floorboards in the bedroom & hallway above, and...