£315 inc VAt !! - are you sure this is the condensing version ?
I have only fitted one Vizo about six months ago - customer bought it - system was chemical cleaned prior to fitting. Time will tell about reliability.
I did jury service last year and didn't get to sit on a single case. I was in the selected 15 for about 7 cases, heard the charges, and never made to final 12. Take some decent books with you.
As somebody said done up before fitting, Problem is when the tap goes and if the tail ( silver braided type ) the fix can be difficult in situ. I've done on this Friday ( silver braid failed). As luck it would it the furthest one away and very difficult to get to. Had no choice but to remove...
Heat Exchanger arrived to day and fitted. The bolier is now not locking out although it's taking a while for radiators to warm up.
I recommended a power flush but they don't want to have it done
What I don't understand how sludge could have built up. The pipework was cleaned with X300 and...
It doesn't seem to be the pump. Took the head off, impellor intact.
I think it's pointing to the HEAT exchanger.
I'll ring Vaillant tomorrow see what they say.
Agile - As I said I do occasional repairs, mainly for the people I do installs for and most of the time I can diagnose faults and...
I haven't taken the head off before although I replaced a failed pumps before. I think it's go four 'allan' screws. Will it come off easily if i undo them or would I have give it smack.
I installed a system ( Vaillant system thermocompact 618/2 and Vantage cylinder) for customer about three years ago. System was flushed with X300 followed with inhibitor.
Got called his morning and ( customer just lives down the road) both heating and hot water is not working.
Went to have...
Replaced an old boiler with one these for a customer about 8 month ago.
In the last few months the boiler has been locking out intermittenly (F7 fault code) requiring a reset on the front panel.
They called WB and the engineers have replaced
1. Gas valve on the first visit
2...
I am sure you can go for a day without a shower. My dad used to have a bath once a month whether he needed one or not.
At weekends I don't bother showering
Brum is totally from Brum of old
Gone is the horrible concrete Bull Ring Center. It's replaced by Modern looking Shopping Centre
The night on Broad street surpasses any of the major cities in Europe
Brum has more canals than Venice
Moseley Bog - JR Tolkien -
Load other the stuff...
Brum is totally from Brum
Gone is the horrible concrete Bull Ring Center. It's replaced by Modern looking Shopping Centre
The night on Broad street surpasses any of the major cities in Europe
Brum has more canals than Venice
Moseley Bog - JR Tolkien -
Load other the stuff that I can...
Try Cambabest 0121 7532020 ( near the Blues ground) or MS Builders ( Saltley) 0121 328 1144
MS Heating do a heat pack with Vailant Boilers
I have also buy from Travis Perkins 0121 557 6437
Tony - What this place called in Smethwick ?
I assume you are in Birmingham from location in your profile.
A lot of the terrace houses in Birmingham share the mains same stop cock. You can have as many four houses running of the same stop cock in the street.
Seven Trent used to lead free replacement ( I think they may still do)...
Tony
"BUT they are selected and boxed and labelled and therefore pretty well guaranteed to fit and do the job."
By “selected” I take it you mean that Ravers don't make the diverter valve but buy it from a third party. In marketing terms the diverter valve is a commodity product. The...
Sorry Masona. I should have been more clearer
Overall length is 8.5m
1 section is approx 2m
chminey is approx 0.5m ( may be a touch more)
2nd sections is approx 6m
I'll measure up accurately tonight