    Periodic Inspection Report

    Hi Everyone I had a job to do a pir in Harrow on the hill this morning on a one bedroom ground floor flat, here are some pictures to show, would like some opinions on some factors regarding the installation. 1 - Sockets and spur was directly above electric hub, Owner suggested to put a...
  2. S

    design work for dentist sergery

    Hello all Viewer's Im doing a project design for a two-storey dentist sergery, would appreciate help to select using manufacturer's data, select suitable luminaires for each area.( Using possibly data from Thorn Catalogue). all other suggestion appreciated. Ceiling's are as follow. All...
  3. S

    Centermetre's convert to Area squared

    Hi All............................................................................................. Just have started my project at college, need some fomula's to calculate area from centimetre's into square's, is it time's 50, then divide by 100 and anybody Know were i can get some...
  4. S

    Pyro Vs SWA

    Hello spark's i am querying on a job i visited at Willowbrook Refferal unit, this is were they send children with special teachings. The unit is having a new gym room, the electrical work was done by some contractor who i haven't met but did talk to about the work carried out by himself on...
  5. S

    3 pin connectors

    Does anyone know what sort of connecter's are available for fluorescent light's, that can be used for disconnecting for maintenace purpose's in an office viod suspended ceiling with mmt2 trunking? An pound of prevention is better than an ounce of cure......
  6. S

    Type C MEM' MCB

    Hello to all sparks. Need second opinion on a new circuit supplying two fluorescent single 5ft light in approx 5 metres in length, i was thinking of taking it from the ccu in 1.5mm Twim and earth, clipped direct above a suspended void ceiling in an office room, to junction box, switch it in...
  7. S

    mr niceic

    hi lectricians and mates, just a quick question, i have a pre-accessment tomorrow with mr niceic for my full enrollment, a bit nervous. What do i expect on his visit? thanks for all replies in advance...........
  8. S

    terminals on my check box

    i recently bought a check box to check and keep a record of the accuracy of my tester, the check box has two red female terminals at the top of the check box which measures volts ac. then lower down there are four black female terminal, the first one is marked 10R, the secound 1R, the third...
  9. S

    NICEIC Enrollment

    i've paid my enrollment fee to NICEIC about a month ago and am waiting for the local engineering guy to contact me. what it was i haven't got any private work to declare, but have work i do for the council. would that be appropiate for enrollment with NICEIC. I am going for the full enrollment...