Sorry, this might be a bit of a tired subject...
I have just bought a replacement double oven and I'm trying to work out what I need to do about the supply.
The existing circuit is 2.5mm T+E radial on a 20A breaker and the new oven is rated at 5.9kW. That is a 25.7A load so I'll need a 32A...