Search results

  1. S

    Airing cuboard built above bulkhead of stairs

    Hi All My airing cuboard is built on to landing above bulk head of my stairs it houses at minute a 114l cylinder which as been there 20yrs or more . the raised floor in there which is raised due to being the bulk of the stairs is showing signs of bowing . next week am due to have my heating...
  2. S

    new alarm panel and 2 new remote key pads with old pir's and

    I need to upgrade/change my alarm panel and remote keypads as all buttons are sticking . will my old pir,s and bell box connect to my new panel ? i got a old pyronix system in at minute
  3. S

    all in 1 tester for sale

    +++++++ Advertising post removed. Mod Rupert +++++++
  4. S

    Tester on ebay for sale

    http://cgi.ebay.co.uk/KEWTECH-KT62-DIGITAL-LOOP-PSC-RCD-INS-CONT-TESTER-NEW_W0QQitemZ190091279130QQihZ009QQcategoryZ121877QQssPageNameZWDVWQQrdZ1QQcmdZViewItem thinking of buying that to get me registered with niceic how much u reckon it will go for?
  5. S

    submain testing.

    When filling out a EIC i always use a seprate SCHEDULE OF TEST RESULTS for any submains feeding seprate CU. but what should i put for Ze and PFC at the top ?
  6. S

    calculating R1+R2

    whats the method used to calculate R1+R2 from r1 rn r2 readings on a ring final?
  7. S

    CSCS card and qualifications

    I got my cscs card in the post today ADULT TRAINEE i sent my certs off for my 16th ed and also EAL domestic installers course (17 units) but on the rear of the card it only state's 16th ed why is that? is the EAL course not recognized by JIB?
  8. S

    ECS card grading

    Hi all Just a question about ECS card i've been told by 1 of my contractors that i need to carry a ecs card whilst on site. Having only past 16th (2381) and EAL Domestic Installers course along with the ECS health and safety assesment. Im just wondering what grading they will give me...
  9. S

    testing at light fittings

    How do you lot go about testing loop tests at light fittings in from off niceic inspectors? with 3 leads plus a button to press wot do you lot do? Please take in mind i dont have a remote probe Tester is kewtech kt62
  10. S

    test results on a TN-S system

    tested on tn-s earthing system with a 100a main switch just tested ZE = .30 and pscc 930 are these ok?
  11. S

    At which side

    At which side of a split load CU do you put the main isolator? i normally put it on the right side with the rcd to the left. Which way round is most popular
  12. S

    Siemens RWB27

    can anyone find the wiring diagram for the Siemens RWB27 heating control timer?? sorry for asking but i did look first and couldnt find anything on there site
  13. S

    combi boiler wiring diagram

    Can 1 of you lot draw me a detailed wiring diagram for a modern combi boiler? (please include types of cable) This must include switched fused spur off ring , external digital siemens time clock , external thermostat and 3 pole switch for isolation next to the boiler (live , neutral and...
  14. S

    sds chuck help

    my chucks playing up on my 24v bosch drill. Its not accepting drill bits properly they eventually click in after a bit of messing about. Its ever since my mate put to much of grease down the chuck. Is there anything i can do about it? ________________ moved as posted in UK electrics
  15. S

    chopping into brick

    can anyone reckommend the best way of chopping back boxes into brick work. i've currently got a contract rewiring kitchens with 10 outlets plus cooker circuit. i'm finding myself taking most of the day chopping out in these old brick houses. i currently use a sds 110v drill with a chisel...
  16. S

    How long to complete this??

    fit new CU with separate 100a isolator new 25mm tails install all main and supp bonding fit new bathroom light and 1st fix LV extractor fan(bathroom) wire up combiboiler including controlls and room stat isolate old ring in kitchen into inspection boxes just below celling. new cooker...
Back
Top