certificate of lawful development

  1. H

    Changing plans post Certificate of lawful development

    Hello, We are building a loft conversion and have received a certificate of lawful development based on the original plans. However we now want to change 2 of the roof windows to slightly larger windows. The opening area will still be 1.7m above the floor and they will be obscure glazed...
  2. L

    House conversion to flats, 4 year rule & continuous use

    Hi, I have some experience of the planning system and have obtained lawful development certificates in the past to confirm the lawfulness of the planning status of a building. However, I currently have a situation I have not seen before with regards to the 4 year rule and the concept of...
  3. O

    Certificate of Lawful Development

    If we are doing an extension plus altering an existing part of our building as well can we apply for 1 x Lawful Development Certificate to cover both these pieces of work (which would be carried out at the same time)? That is, we describe our Class A (new extension) and Class B (alteration of...
  4. P

    Deemed discharge, Appeal, what are the processes?

    I am have 4 items requiring solutions. 1) I have waited 3 years to have pre-commencement conditions signed off. All signed off one by one in writing but no sign of either a Discharge Certificate or a Certificate of Lawfulness. I am about to submit a Deemed Discharge letter, but what happens...