Hi ,
I just wanted to ask for peoples experience/advice.
I am installing a toilet under the ground floor stairs. The 6 metre 110mm soil pipe will go from here to the back garden under the floor hanging from the joists. Only issue is the direction the toilet will face(towards the garden) means it needs a 180 degree bend directly underneath it to the 6 metres soil pipe as I said it then leads to the garden .
I just want to know if it could mean problematic blockages if I fit a 180 degree bend on the toilet outflow to go underfloor. ?
Also do you think these corrugated flexi bends are a bad idea and best to stick with unflexible bends.?
Is it best to go for 25mm drop every 1 metre on the 6 metre horizontal run, whats the minimum drop i can manage ?
Regarding ventilation has anyone found the devices that remove odour by sucking air from the toilet and pushing into the soil pipe a good buy , can you recommend ?
Many Thanks for your help.
Steve.
I just wanted to ask for peoples experience/advice.
I am installing a toilet under the ground floor stairs. The 6 metre 110mm soil pipe will go from here to the back garden under the floor hanging from the joists. Only issue is the direction the toilet will face(towards the garden) means it needs a 180 degree bend directly underneath it to the 6 metres soil pipe as I said it then leads to the garden .
I just want to know if it could mean problematic blockages if I fit a 180 degree bend on the toilet outflow to go underfloor. ?
Also do you think these corrugated flexi bends are a bad idea and best to stick with unflexible bends.?
Is it best to go for 25mm drop every 1 metre on the 6 metre horizontal run, whats the minimum drop i can manage ?
Regarding ventilation has anyone found the devices that remove odour by sucking air from the toilet and pushing into the soil pipe a good buy , can you recommend ?
Many Thanks for your help.
Steve.