- Joined
- 18 Nov 2015
- Messages
- 49
- Reaction score
- 1
- Country
Hi,
I am looking to add an additional radiator in my front room. I will be tapping in to the existing pipework (pipework) which is under the floor boards.
As it is a combi boiler I understand that I need to first turn it off electrically and then drain the system using the drain valve and hose pipe. Then open all the bleed valves to empty the system completely starting at the top of the house.
Will this also empty the pipe work under the floor or will this still contain water?
Then add the radiator and pipework, add inhibitor via towel radiator and re-pressurise? Is that pretty much it?
I have toyed with the idea of getting the system flushing but not sure it is needed?
Thanks,
Martin.
I am looking to add an additional radiator in my front room. I will be tapping in to the existing pipework (pipework) which is under the floor boards.
As it is a combi boiler I understand that I need to first turn it off electrically and then drain the system using the drain valve and hose pipe. Then open all the bleed valves to empty the system completely starting at the top of the house.
Will this also empty the pipe work under the floor or will this still contain water?
Then add the radiator and pipework, add inhibitor via towel radiator and re-pressurise? Is that pretty much it?
I have toyed with the idea of getting the system flushing but not sure it is needed?
Thanks,
Martin.