Hi, planning permission has been granted to extend both sides of our chalet bungalow, however only one side is required at this time to extend the kitchen area by 50 Square Meter, rendered block and pitched tiled roof construction.
I find myself in a bit of a tricky position as a complete novice to the rules and regulations and am looking for some guidance. Unfortunately the architect is very difficult to communicate with and have almost given up hope of him completing the building regs. drawings. I wonder if these drawings are actually necessary as I have read conflicting accounts on here. I wonder if the local building control office would be helpful or use some other method to get things moving forward.
I find myself in a bit of a tricky position as a complete novice to the rules and regulations and am looking for some guidance. Unfortunately the architect is very difficult to communicate with and have almost given up hope of him completing the building regs. drawings. I wonder if these drawings are actually necessary as I have read conflicting accounts on here. I wonder if the local building control office would be helpful or use some other method to get things moving forward.