Hi folks,
I'm preparing the kitchen floor for tiling. The floor is not level (been like this since I bought the house) and want to address the floor before tiling but don't want to go overboard unnecessarily.
I took the spirit level and drilled some screws on each end to determine how much it had sunk by.
The max gap is 40mm - see below where the floor has sunk
View media item 107103
The gap in the middle is around 20mm.
View media item 107102
So in effect the current situation is,. Left to right it's 0mm > 20mm > 40mm.
I plan to lift the existing T&G boards. I have the following options:
1- Use 18mm ply, seal the sides and bottom bit with a primer/sealer.
2- use 18mm OSB, seal the sides and bottom but
3- use 8mm plywood over existing floorboards
Please can someone point me at the direction.
a) what option is the best? (From above)
B) how do I level the floor? Do I lift the joists?
Any pointers will be greatly appreciated
I'm preparing the kitchen floor for tiling. The floor is not level (been like this since I bought the house) and want to address the floor before tiling but don't want to go overboard unnecessarily.
I took the spirit level and drilled some screws on each end to determine how much it had sunk by.
The max gap is 40mm - see below where the floor has sunk
View media item 107103
The gap in the middle is around 20mm.
View media item 107102
So in effect the current situation is,. Left to right it's 0mm > 20mm > 40mm.
I plan to lift the existing T&G boards. I have the following options:
1- Use 18mm ply, seal the sides and bottom bit with a primer/sealer.
2- use 18mm OSB, seal the sides and bottom but
3- use 8mm plywood over existing floorboards
Please can someone point me at the direction.
a) what option is the best? (From above)
B) how do I level the floor? Do I lift the joists?
Any pointers will be greatly appreciated