Wanting some advice on ways to finish this bitumen flooring as there is a small gap of 10mm around the edge to the wall and the floor .
The walls are damp under the dpm that are in the walls on the outer wall and on the 2 inside walls which is weired .
The dpm in the walls are probably about 15mm up the wall so you can see damp bricks under that dpm .
Any ideas welcome on how to remedy .
I thought maybe,
put dpm in the wall and overlap on the floor then screed over the top .
Or maybe use a slurry up the wall to dpm and on the floor too. Then screed floor.
Thanks roxy
The walls are damp under the dpm that are in the walls on the outer wall and on the 2 inside walls which is weired .
The dpm in the walls are probably about 15mm up the wall so you can see damp bricks under that dpm .
Any ideas welcome on how to remedy .
I thought maybe,
put dpm in the wall and overlap on the floor then screed over the top .
Or maybe use a slurry up the wall to dpm and on the floor too. Then screed floor.
Thanks roxy