- Joined
- 11 Jul 2007
- Messages
- 440
- Reaction score
- 3
- Country
Plastering under the new attic stairs, double winder.
I've attached noggins across at the back of each step.
Have read this post //www.diynot.com/forums/viewtopic.php?p=1803140#1803140
which was very useful.
My questions are:
Do you just use the email on the winders and plaster board the straight?
If so how do you deal with the step from board to eml?
Shaping the EML round the winder seems tough (my plasterer hasn't done it this way before so I am trying to set it up for him).
Any tips?
I've had a go with regular galvanised wire mesh to work out the shape, however the eml is narrower, so I'll have to do in sections and try to tie together? Any tips?
Should I put in more noggins?
Finally any thoughts on finishing the top of the stairs to the ceiling?
Thanks in advance
I've attached noggins across at the back of each step.
Have read this post //www.diynot.com/forums/viewtopic.php?p=1803140#1803140
which was very useful.
My questions are:
Do you just use the email on the winders and plaster board the straight?
If so how do you deal with the step from board to eml?
Shaping the EML round the winder seems tough (my plasterer hasn't done it this way before so I am trying to set it up for him).
Any tips?
I've had a go with regular galvanised wire mesh to work out the shape, however the eml is narrower, so I'll have to do in sections and try to tie together? Any tips?
Should I put in more noggins?
Finally any thoughts on finishing the top of the stairs to the ceiling?
Thanks in advance