We have had to install a beam and block floor throughout the whole house on the ground floor. Despite having spread sand and cement slurry across it, in some areas the blocks sit about 1-2mm lower than the beams. Bearing in mind we have to lay PIR and screed - should I be worried about the insulation not being completely supported underneath?
In areas there is build up from cement/ materials used to do other jobs - which is quite hard to remove. Should I try to remove this or not worry about it?
In areas there is build up from cement/ materials used to do other jobs - which is quite hard to remove. Should I try to remove this or not worry about it?
