Hello folks
just wondering if anyone has any experience of laying this flooring at all. I have 2 rooms to do, about 95% over floorboards and 5% over concrete.
Do I need to lay a damp screen down over the lot or just the concrete part? The underlay I have gone for is fibre board (7mm) if that's relevant.
Any advice greatly appreciated
Cheers
just wondering if anyone has any experience of laying this flooring at all. I have 2 rooms to do, about 95% over floorboards and 5% over concrete.
Do I need to lay a damp screen down over the lot or just the concrete part? The underlay I have gone for is fibre board (7mm) if that's relevant.
Any advice greatly appreciated
Cheers