Afternoon All hope your have had a good xmas n new year.
My bathroom currently has a 900watt ish Gravity feed rad in the bathroom that is plumbed into the hot water curcuit i.e. only gets hot when hot water is selected on my oil boiler system.
Now im currently changing my bathroom and would like to alter this to become a central heated towl rail.
I have a few reasons for this firstly we would like a towl rail, we heat the water in E7 time therefore doesnt heat the bathroom and i have an air leak thats dragging in air on the hot water side when oil is selected but doesnt induce air when central heating is selected therefore there must be an air induction into the system on that part. So other than them lol im trying to work out the best way to plump a new towl rail into pipework current there.
Any ideas
Thanks all
My bathroom currently has a 900watt ish Gravity feed rad in the bathroom that is plumbed into the hot water curcuit i.e. only gets hot when hot water is selected on my oil boiler system.
Now im currently changing my bathroom and would like to alter this to become a central heated towl rail.
I have a few reasons for this firstly we would like a towl rail, we heat the water in E7 time therefore doesnt heat the bathroom and i have an air leak thats dragging in air on the hot water side when oil is selected but doesnt induce air when central heating is selected therefore there must be an air induction into the system on that part. So other than them lol im trying to work out the best way to plump a new towl rail into pipework current there.
Any ideas
Thanks all
