Ok, a few probably dumb questions, but its always the simple stuff that isn't explained properly anywhere, and I wanna make sure I get things right.
1 - Earth Bonding
So far I've bonded all radiators and pipework together... How do I link to the main earth for the house? Do I connect the earth bonding into the shower's earth terminal, or run an earth to the consumer unit, or both?
2 - Connecting Shower To Consumer Unit
Should be fairly straight forward as I am just swapping the old 6mm cable and uprating the MCB. Can I do this and open up the consumer unit just by switching off the main switch on the CU, or do you need to isolate the supply by pulling the main fuse or something?
Prize goes to the first person to post "If you don't know that, you should call an electrician"
Thanks,
Andrew
1 - Earth Bonding
So far I've bonded all radiators and pipework together... How do I link to the main earth for the house? Do I connect the earth bonding into the shower's earth terminal, or run an earth to the consumer unit, or both?
2 - Connecting Shower To Consumer Unit
Should be fairly straight forward as I am just swapping the old 6mm cable and uprating the MCB. Can I do this and open up the consumer unit just by switching off the main switch on the CU, or do you need to isolate the supply by pulling the main fuse or something?
Prize goes to the first person to post "If you don't know that, you should call an electrician"
Thanks,
Andrew