i have some very large ceilings in a loft conversion to do, i have to roll the joint at the top therfore dooing it all in one set, where would you put a break in the set if at all or would you add something to the mix to slow it down and do the lot in one? i know in an ideal world i would get someone o help me but dont have a lot of work on and dont want to give what i do have away.
