Im wanting to upgrade my central heating before I get a new boiler fitted .
What I have just now is 2 rows of 15mm copper pipe running under floor with no installation. (Flow and return)
From each piece it feeds 4 radiators from 1985 with microbore pipe , think its 8mm.
The boiler is having trouble pushing heat I presume as it comes on for a minute then turns on for a minute ( it heats 1 degree every hour)
Under floor I have a crawl space about 1.5 foot that I can get under . And 2 foundation walls that the microbore goes over to the rad.
I was thinking of replacing the flow and return with 22m, and using 15mm hep pipe to connect the rads .
The floor is laminate and tile, would (one part i can go down is under carpet.)
Would I be able to connect the 15mm pipes to the microbore pipe and pull them through from the top to the new pipe .
What I have just now is 2 rows of 15mm copper pipe running under floor with no installation. (Flow and return)
From each piece it feeds 4 radiators from 1985 with microbore pipe , think its 8mm.
The boiler is having trouble pushing heat I presume as it comes on for a minute then turns on for a minute ( it heats 1 degree every hour)
Under floor I have a crawl space about 1.5 foot that I can get under . And 2 foundation walls that the microbore goes over to the rad.
I was thinking of replacing the flow and return with 22m, and using 15mm hep pipe to connect the rads .
The floor is laminate and tile, would (one part i can go down is under carpet.)
Would I be able to connect the 15mm pipes to the microbore pipe and pull them through from the top to the new pipe .