Hi
I currently have the ceiling removed in my kitchen and I am planning to run a cable from the boiler to the hot water tank, future controller position and pump in preparation for a Y or W plan valve and thermostat and controller etc. (we currently have a set up made by Mr Heath and Mr Robbinson). My question is what type of cable do I need to run from the boiler to the pump in preparation for the work when funds permit.
Thanks for any comments
peely
I currently have the ceiling removed in my kitchen and I am planning to run a cable from the boiler to the hot water tank, future controller position and pump in preparation for a Y or W plan valve and thermostat and controller etc. (we currently have a set up made by Mr Heath and Mr Robbinson). My question is what type of cable do I need to run from the boiler to the pump in preparation for the work when funds permit.
Thanks for any comments
peely