HAve to drill holes in the foundations to set rebar and resin in to connect the two foundations. What size holes are adequate for drilling to take 12mm rebar and resin.
Im thinking 16mm which gives 2mm either side of the rebar or should i go with thicker holes for more resin?
Im thinking 16mm which gives 2mm either side of the rebar or should i go with thicker holes for more resin?
