Wow - quite a little debate rumbling on here.
Thanks for all the input. Lots to think about.
Glad its not just me who thinks the work is a bit shoddy.
Small update:
My intention is to take pics (which I'll post here too) then dig out Installation Ceritificate and get in touch with the relevant body and see what they say. Then at least that way I can present the developer / electricians with facts instead of questions.
I did catch up with one of the two site managers this morning. He mentioned the choc block connectors should have only been used on low voltage stuff (i.e. the LED down-lighters) and not for sockets and mains lighting. He says he will get someone to look at it, but I still want it checked properly as I want to know what lurks elsewhere.
At least he seemed fairly amenable and not at all defensive.
ThanksStef
Thanks for all the input. Lots to think about.
Glad its not just me who thinks the work is a bit shoddy.
Small update:
My intention is to take pics (which I'll post here too) then dig out Installation Ceritificate and get in touch with the relevant body and see what they say. Then at least that way I can present the developer / electricians with facts instead of questions.
I did catch up with one of the two site managers this morning. He mentioned the choc block connectors should have only been used on low voltage stuff (i.e. the LED down-lighters) and not for sockets and mains lighting. He says he will get someone to look at it, but I still want it checked properly as I want to know what lurks elsewhere.
At least he seemed fairly amenable and not at all defensive.
ThanksStef