• Looking for a smarter way to manage your heating this winter? We’ve been testing the new Aqara Radiator Thermostat W600 to see how quiet, accurate and easy it is to use around the home. Click here read our review.

Concrete coverage over void former

Joined
1 Dec 2019
Messages
946
Reaction score
36
Country
United Kingdom
I am constructing some steps that will go from my deck down to the garden. The drop is about 400mm and I plan to have this in 2 steps (possibly 3 if the drop is slightly greater). Rather than mess about with some form of timber structure I am thinking if forming them in blockwork and then mass filling with concrete and cladding with some sort of stone.

Should I just fill or void former then fill. If the later how much coverage is required over the foam slabs?
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top