Good morning
I am planning to build an 8 meter by 4 meter, 12 foot high office in my garden with concrete blocks.
Currently there is a 12 inch concrete base covering a 1/3rd of the area where two sheds used to stand. I have dug out the necessary soil for the rest of the area. Could someone please advise me if it is ok to board and peg out the rest of the area, fill it with concrete, bringing it up to the 12 inch level and use this as a base.
Thanks in advance
Sunburn
I am planning to build an 8 meter by 4 meter, 12 foot high office in my garden with concrete blocks.
Currently there is a 12 inch concrete base covering a 1/3rd of the area where two sheds used to stand. I have dug out the necessary soil for the rest of the area. Could someone please advise me if it is ok to board and peg out the rest of the area, fill it with concrete, bringing it up to the 12 inch level and use this as a base.