How do you guys run cables for electric mirrors/demister pads in tiled bathroom walls. I was going to tile my ensuite wall and leave the otherside of the studwork open to drop a cable through after and pass through a hole cut in the tile. I can then close the other side of the stud and tile the bathroom. This works but means the tiler can't complete both bathrooms at the same time.
How do you normally do this. Is there a small backbox/access route used with tiles for this sort of thing?
How do you normally do this. Is there a small backbox/access route used with tiles for this sort of thing?
