Hello
I am about to price to convert a semi pumped system, gravity fed to the cylinder to a fully pumped.
As you probably know I am new to heating, so please correct me if I am wrong.
Cut off and cap gravity fed side of boiler reconnect cut ends to pumped side via a controls pack.
Is that it? are there any obvious problems that may be encountered.
What type of control pack do you recommend for this type of job Y or S
plan.
Thankyou
Brian
I am about to price to convert a semi pumped system, gravity fed to the cylinder to a fully pumped.
As you probably know I am new to heating, so please correct me if I am wrong.
Cut off and cap gravity fed side of boiler reconnect cut ends to pumped side via a controls pack.
Is that it? are there any obvious problems that may be encountered.
What type of control pack do you recommend for this type of job Y or S
plan.
Thankyou
Brian