My Dad had a shower installed 9 years ago. he has recentlly had the shower cubicle retiled and thinks the company doing this have damaged the pipe work in the process of removing the tiles, as he now has water coming through the ceiling.
The company who removed the tiles clain the problem has been caused by corrosion of the tiles by the plaster/cement in the wall. I know that cement can corrode copper, but thought it would take a lot longer than 9 years for this to occur.
Any advice would be great, thanks very much.
The company who removed the tiles clain the problem has been caused by corrosion of the tiles by the plaster/cement in the wall. I know that cement can corrode copper, but thought it would take a lot longer than 9 years for this to occur.
Any advice would be great, thanks very much.