Can anyone give me an idea of the cost implication for changing from wet rads to wet ufh on a new build?
I would assume that the oversite concrete and the 100mm celotex insulation would be the same, it's just that ufh pipes are laid before the floor screed is applied. Obviously there would be some savings on radiators and cop[per pipe, so I'm not expecting a huge cost implication.
Am I correct or have I missed something.
I would assume that the oversite concrete and the 100mm celotex insulation would be the same, it's just that ufh pipes are laid before the floor screed is applied. Obviously there would be some savings on radiators and cop[per pipe, so I'm not expecting a huge cost implication.
Am I correct or have I missed something.