Just been chatting to a friend and the concurrent topic of smartmeters cropped up.
"Don't talk to me about f****** smart meters he says."
He has a plot of land, let's call it a farm as a description. One of the outbuildings was rented out to a tenant who had his own supply and meter fitted. When he moved out I reverted the CU to the original 32A feed from the main house and all was well for several years.
One day a van turned up with paperwork to install 3 smartmeters (there are 3 on site). Despite seeing the unused meter and the property owner not signing anything he insisted on replacing it (without any loadside tails at request of property owner).
Eversince they have been billing 'the occupier' with an estimated bill equivalent to the previous tenants useage and in addition his own estimated usage has increased by the same amount. The 3rd meter on site is working correctly.
Other than the apparent failure to remotely read the meters and failure to understand that one meter is redundant and not registered to any customer it has actually clocked up >20KWh in 2 years.
FWIW all 3 meters are in a glass fibre pillar so no excuse for one working and not the others.
"Don't talk to me about f****** smart meters he says."
He has a plot of land, let's call it a farm as a description. One of the outbuildings was rented out to a tenant who had his own supply and meter fitted. When he moved out I reverted the CU to the original 32A feed from the main house and all was well for several years.
One day a van turned up with paperwork to install 3 smartmeters (there are 3 on site). Despite seeing the unused meter and the property owner not signing anything he insisted on replacing it (without any loadside tails at request of property owner).
Eversince they have been billing 'the occupier' with an estimated bill equivalent to the previous tenants useage and in addition his own estimated usage has increased by the same amount. The 3rd meter on site is working correctly.
Other than the apparent failure to remotely read the meters and failure to understand that one meter is redundant and not registered to any customer it has actually clocked up >20KWh in 2 years.
FWIW all 3 meters are in a glass fibre pillar so no excuse for one working and not the others.

