I have a back boiler system with 7 rads.
I added a bottle of system cleaner about 4 weeks ago so it could be working around the system, and have contacted a local plumber to carry out the following work....
Drain down and flush (not powerflush) the system a couple of times to wash out the cleaner, and hopefully some of the crud from the system.
While drained down fit two thermostatic valves to two of the rads. Fit a spirotrap magnabooster to the boiler input pipe. Fill system, add inhibitor, and sort any airlocks.
I am supplying the spirotrap unit, but the plumber is supplying the two valves and the inhibitor fluid.
I do not know how long this will take, but am guessing at about 3-4 hours.
Quote I have been given is £250.........
Is this in the ball park of being reasonable.
Cheers
Steve
I added a bottle of system cleaner about 4 weeks ago so it could be working around the system, and have contacted a local plumber to carry out the following work....
Drain down and flush (not powerflush) the system a couple of times to wash out the cleaner, and hopefully some of the crud from the system.
While drained down fit two thermostatic valves to two of the rads. Fit a spirotrap magnabooster to the boiler input pipe. Fill system, add inhibitor, and sort any airlocks.
I am supplying the spirotrap unit, but the plumber is supplying the two valves and the inhibitor fluid.
I do not know how long this will take, but am guessing at about 3-4 hours.
Quote I have been given is £250.........
Is this in the ball park of being reasonable.
Cheers
Steve