If a CU is being moved from the electric meter to another room, you have a metal clad switchfuse next to meter, and 25mm 3 Core SWA from switchfuse to metal CU. With one of the 3 Cores being used as the CPC.
Does the CPC from the supply to switchfise need to be uprated to 25mm as well or is it ok to leave it 16mm?
16mm is all that is required for house, but Im not sure if theres any reg that would affect using different sizes of cable in such a case, even though there all above or equal to requirments
If a CU is being moved from the electric meter to another room, you have a metal clad switchfuse next to meter, and 25mm 3 Core SWA from switchfuse to metal CU. With one of the 3 Cores being used as the CPC.
Does the CPC from the supply to switchfise need to be uprated to 25mm as well or is it ok to leave it 16mm?