- Joined
- 28 Feb 2017
- Messages
- 9
- Reaction score
- 0
- Country
Hi,
So I admit I have been an impatient fool!
Painting our downstairs toilet and instead of waiting the correct amount of time between coats I painted an additional coat over the first coat that wasn't quite dry. This has resulted in cracking.
What would the best course of action be? Will using Polycell base coat remedy this or is more drastic action required?
Thanks.
So I admit I have been an impatient fool!
Painting our downstairs toilet and instead of waiting the correct amount of time between coats I painted an additional coat over the first coat that wasn't quite dry. This has resulted in cracking.
What would the best course of action be? Will using Polycell base coat remedy this or is more drastic action required?
Thanks.