Hello,
I've been reading this forum for a while now and have now finally signed up.
I hope some of you can answer my question.
I am soon to demolish my concrete sectional garage with asbestos cement sheet roofing. When it is down I want to keep 1/2 of the concrete base. The front half is all cracked but the back half is in decent condition and I am planning to cut it in half and use the base to put a new shed on.
I am a reasonable DIY’er and want to do the whole project myself to save money.
I have seen masonry saws for hire but I have never used one before.
I would like to cut a straight, neat line in the base. Is this possible or am I best just ripping the whole thing up?
It would be nice to keep half the base to save time and money.
The front half after the cut I will take up and put down lawn.
The base is 4 inch's thick and as far as I aware not enforced.
How and where do I even start?
Thank you.
I've been reading this forum for a while now and have now finally signed up.
I hope some of you can answer my question.
I am soon to demolish my concrete sectional garage with asbestos cement sheet roofing. When it is down I want to keep 1/2 of the concrete base. The front half is all cracked but the back half is in decent condition and I am planning to cut it in half and use the base to put a new shed on.
I am a reasonable DIY’er and want to do the whole project myself to save money.
I have seen masonry saws for hire but I have never used one before.
I would like to cut a straight, neat line in the base. Is this possible or am I best just ripping the whole thing up?
It would be nice to keep half the base to save time and money.
The front half after the cut I will take up and put down lawn.
The base is 4 inch's thick and as far as I aware not enforced.
How and where do I even start?