Cutting rafters next to the purlin for Velux window

Just curious, what is the best way to attach trimmer and double joists. M10 bolt and nuts or just big wood screws?
 
Sponsored Links
Sponsored Links
I'll be putting an inch batten under the tile battens to have the 50mm air gap and then filling the rafters with 75mm PIR insulation followed by Superfoil SF19 moisture barrier plus plasterboard, etc.

Deleted
 
Last edited:

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top