Greetings all,
I have moved into a house built roughly in 1900, there is a parquet floor in the living room which has suffered from damp recently from the concrete floor - I had a damp inspection carried out by an independent surveyor which confirmed this. I have lifted the parquet blocks. As expected there is patchy bitumen adhesive residue all over the floor (not intended for dpm, or if it was it has failed and now needs rectifying). The floor is quite level other than the 1mm difference where the bitumen is. Hopefully there is an image attached below.
I have read through all (I think) the parquet/damp concrete sub-floor threads in this forum and picked up some great information. I have spoken to F.Ball, Sika and Ardex about how best to form a new DPM - so far my best option is this.
1. Clean floor (but leave bitumen residue that is sound).
2. Level with Arditex NA (advised by Ardex to isolate bitumen before DPM)
3. Epoxy DPM.
4. Level with Arditex NA again (advised by Ardex to form sandwich DPM)
This will work out quite expensive (for me anyway - £500 ish for floor leveller, dpm and parquet adhesive). Does anybody have any other suggestions/advice/cheaper methods of how to damp proof the floor effectively so that I can relay the blocks?
Many thanks in advance.
I have moved into a house built roughly in 1900, there is a parquet floor in the living room which has suffered from damp recently from the concrete floor - I had a damp inspection carried out by an independent surveyor which confirmed this. I have lifted the parquet blocks. As expected there is patchy bitumen adhesive residue all over the floor (not intended for dpm, or if it was it has failed and now needs rectifying). The floor is quite level other than the 1mm difference where the bitumen is. Hopefully there is an image attached below.
I have read through all (I think) the parquet/damp concrete sub-floor threads in this forum and picked up some great information. I have spoken to F.Ball, Sika and Ardex about how best to form a new DPM - so far my best option is this.
1. Clean floor (but leave bitumen residue that is sound).
2. Level with Arditex NA (advised by Ardex to isolate bitumen before DPM)
3. Epoxy DPM.
4. Level with Arditex NA again (advised by Ardex to form sandwich DPM)
This will work out quite expensive (for me anyway - £500 ish for floor leveller, dpm and parquet adhesive). Does anybody have any other suggestions/advice/cheaper methods of how to damp proof the floor effectively so that I can relay the blocks?
Many thanks in advance.