I’m a complete novice at DIY and have taken on a bit of a largish deck job at the rear of my property. I moved most of the existing concreted patio and the deck frame is now larger than the concrete patio was. Deck frame is 50x150mm pressure treated timber. I’ve kept a partial amount of the previous patio to hold up the frame and the remaining three sides I’ve put 50mm concrete paving slabs at intervals of every 1.5m. My question is as it was meant to be a ground deck and then subsequently has turned into a low level deck should I have put posts in between to hold up the structure more? After realising my mistake I’ve put more concrete paving slabs under but not secured in by any means. Have a look at the pictures and all feedback is welcome.
Thanks, Rick
Thanks, Rick