I would agree until the building regs issue was pointed out. And the legionnaires issue about the current system. You know what people can be like, if they see i've ignored one reg they might wonder about the quality of everything else. As it just needs a tee and a hose from the cold supply its no extra work but i'd need to factor the location in ahead anyway and its only £150 each for the heater so might as well just have it in, its a soft water area so it should last ok and can be turned off warmer times of year.Not sure I would start spending money now on something I've no plans to sell in future, to satisfy as yet unknown wants of a persnickety buyer?!
As they are similar power draw to a shower I'd need to have a dedicated circuit and now is the ideal time to run the wire and as we've not had a new consumer unit done yet it can be connected at that time, so maybe by next winter we'd have it working but not stressed if we dont.
