After a bit of help.
So currently digging out footings for my extension. I need to move my drain which is getting a build over agreement.
My question in how do you go about putting in the new drains with out all the footings caving in I am thinking common sense just to shaw them up the dig by hand on the edge if not any tips welcome
Probably done it arse about face thinking of it drainage should of been dug first
Also building a soak away this is not to much of a issue as can take it to the boundary of the footings then dig the last bit once poured
Attached is where I am at the moment
So currently digging out footings for my extension. I need to move my drain which is getting a build over agreement.
My question in how do you go about putting in the new drains with out all the footings caving in I am thinking common sense just to shaw them up the dig by hand on the edge if not any tips welcome
Probably done it arse about face thinking of it drainage should of been dug first
Also building a soak away this is not to much of a issue as can take it to the boundary of the footings then dig the last bit once poured
Attached is where I am at the moment