I need to drain down my conventional gravity fed system to fit a towel radiator in my downstairs loo (new valves)
I know how to do this but what is the best way? Shut of all the radiator valves (and locksheilds?), or just drain down and refill? ny other tips?
Any advice appreciated (or pointing to a previous post I have missed)
TIA
I know how to do this but what is the best way? Shut of all the radiator valves (and locksheilds?), or just drain down and refill? ny other tips?
Any advice appreciated (or pointing to a previous post I have missed)
TIA