I've just had some walls plastered with 1) Thistle hardwall followed by 2) mutlifinish skim.
The total thickness is approx 25mm.
How long would you expect to leave it to dry before hanging a radiator?
It was done on Friday and the skim coat is already bright pink (the room has had a good airing ever since but no direct heating).
Thanks guys.