Recently purchased a house and replaced central heating and realised that there was main bonding to gas, but not to the cold mains or any supplementary bonding
Now I know bonding has been taken out and is not notifiable so I wanted to do this myself.
I know the bathroom needs to be done, there will be a radiator in there, and pipes (hot and cold) for basin, bath (acrylic), thermostatic combi shower, and a cold inlet for WC. These all feed off the same 2 pipes coming from down stairs, and 2 pipes for rad.
In the kitchen directly below is the mains cold in and the entral heating combi.
What is the best way to do this, as to not overdo it either?
Thanks
Now I know bonding has been taken out and is not notifiable so I wanted to do this myself.
I know the bathroom needs to be done, there will be a radiator in there, and pipes (hot and cold) for basin, bath (acrylic), thermostatic combi shower, and a cold inlet for WC. These all feed off the same 2 pipes coming from down stairs, and 2 pipes for rad.
In the kitchen directly below is the mains cold in and the entral heating combi.
What is the best way to do this, as to not overdo it either?
Thanks