Maybe. However, as I've recently written, the most crucial question is the nature (material) of the pipe supplying the gas meter. If it is plastic, and the meter (and all of your copper pipe) are above ground, then there probably is no need to bond the gas pipework at all.nope. thats way out the way.. so looks like the wire routing option unfortunatly
Kind Regards, Johyn
Hi Johyn.. yes i checked as you stated and it is copper.