i have read a few posts on this topic and think i'm ready to have a go...
can anyone run me through the procedure for this job ?
at present i've been told to :-
1/ PVA the concrete
2/ Visqueen the area with a 6" taped overlap raising at the walls
3/ 4mm hardboard base taped at edges
4/ underlay (fiber board type)
5/ lay flooring glueing t&g
anything else please advise.
many thanks
thebarber
can anyone run me through the procedure for this job ?
at present i've been told to :-
1/ PVA the concrete
2/ Visqueen the area with a 6" taped overlap raising at the walls
3/ 4mm hardboard base taped at edges
4/ underlay (fiber board type)
5/ lay flooring glueing t&g
anything else please advise.
many thanks
thebarber